Logo of Huzzle

Information Technology- Enterprise Database Support Intern

Applications are closed

  • Internship
    Full-time
    Summer Internship
  • Data
    IT & Cybersecurity
  • Chicago

Requirements

  • Letter of recommendation from a class instructor, professor, or Internship Coordinator from current school or university.
  • Cover letter stating interest in position.
  • Resume.
  • Currently enrolled in a degree-seeking program in an accredited college or university and will be enrolled in the 2025/2026 school year.
  • Permanent residency within the territorial boundaries of the MWRD (students may attend school outside the territorial boundaries).
  • You must be a citizen or national of the United States, or an individual who is otherwise legally authorized to work in the United States.
  • Knowledge of programming, debugging and SQL scripting.
  • Experience with Microsoft Word and Excel.
  • Excellent written and oral communication skills.
  • Can work both independently and in a team environment.
  • Applicants must be a current graduate or undergraduate student seeking a degree in (insert).

Responsibilities

  • Assisting with help desk requests
  • SQL scripting

FAQs

What is the location of the internship?

The internship is located at 100 E. Erie St., Chicago, IL 60611.

What is the hourly pay for the intern position?

The hourly pay for the intern position is $18.00.

How many hours can a paid intern work in a calendar year?

Paid interns are limited to 119 working days per calendar year.

What documents are required to apply for the internship?

Required documents include a letter of recommendation, a cover letter stating interest in the position, and a resume.

What are the eligibility requirements for this internship?

Applicants must be currently enrolled in a degree-seeking program at an accredited college or university, must have permanent residency within the territorial boundaries of the MWRD, and must be a citizen or legally authorized to work in the United States.

What responsibilities will the intern have?

The intern will assist with help desk requests and engage in SQL scripting.

What minimum qualifications are required for the position?

Candidates must have knowledge of programming, debugging, and SQL scripting, experience with Microsoft Word and Excel, excellent written and oral communication skills, and the ability to work both independently and in a team environment.

What educational requirements must applicants meet?

Applicants must be current graduate or undergraduate students seeking a degree in information technology or a related field.

Where should candidates submit their application?

Candidates are required to submit their application through the MWRD’s Online Employment Center.

Who can I contact for questions regarding the internship program?

Questions regarding the internship program may be directed to MWRDInternships@mwrd.org.

The MWRD treats wastewater and manages stormwater for the Chicago region.

Government
Industry
1001-5000
Employees
1889
Founded Year

Mission & Purpose

Established in 1889, the Metropolitan Water Reclamation District of Greater Chicago is an award-winning, special purpose government agency responsible for wastewater treatment and stormwater management in Cook County, Illinois. The MWRD provides services throughout an 883 square mile area which includes the City of Chicago and suburban communities. The MWRD serves an equivalent pop. of 10.35 million citizens; 5.25 million people, a commercial and industrial equivalent of 4.5 million people, and a combined sewer overflow of .6 million people. The MWRD's 554 miles of intercepting sewers and force mains range in size from 12 inches to 27 feet in diameter and are fed by approximately 10,000 local sewer system connections. The MWRD's Tunnel and Reservoir Plan (TARP) is one of the country’s largest public works projects for pollution and flood control. Four tunnel systems total 109 miles of tunnels, nine to 33 feet in diameter and 150 to 300 feet underground, are in operation. Three TARP reservoirs are in operation and construction is in progress on the remaining 6.5 billion gallon portion of the McCook Reservoir. The MWRD owns and operates the Stickney Water Reclamation Plant, the world’s largest, in addition to six other plants and 23 pumping stations. Treating an average of 1.4 billion gallons of wastewater each day, the MWRD's total wastewater treatment capacity is over 2 billion gallons per day. The MWRD recycles all biosolids and has an aggressive outreach program.