Logo of Huzzle

RACE ITER Electrical Engineering Year in Industry Placement 2024 (FTA)

Applications are closed

  • Internship
    Full-time
    Placement Program
  • Engineering
  • £20.2K
  • London

Requirements

  • To be considered you will need to be undertaking your degree in the United Kingdom within a relevant area and have the right to work in the UK for the duration of the year.  

Responsibilities

  • Working within one of the projects teams on ITER. This will be confirmed closer to the placement but will likely include working through from concept design to detailed design of mock-ups, tools, robot cells and proof of concept trials.

Developing the ultimate energy source, fusion energy

Energy
Industry
1001-5000
Employees
1954
Founded Year

Mission & Purpose

As the UK’s national fusion lab, the UK Atomic Energy Authority’s mission is to lead the commercial development of fusion power and related technology, and position the UK as a leader in sustainable fusion energy. We are meeting the scientific and engineering challenges that come with such a grand ambition. UKAEA is made up of four main facilities: Culham Centre for Fusion Energy (CCFE), Remote Applications in Challenging Environments (RACE), Materials Research Facility (MRF), and - in partnership with STFC - the Oxfordshire Advanced Skills (OAS) apprentice training centre. As part of CCFE, we operate the world’s largest fusion device – the Joint European Torus, or JET – on behalf of the European fusion consortium EUROfusion. Connect with us to hear more about our world-class research and career opportunities and to discuss commercial opportunities.